Hot / Cold Drilling for Booster, T/C, Bubbler Installation

HAL can provide highly trained personal for drilling the Glass melting furnace in hot / cold condition, for the introduction of thermocouples, bubblers, and boost electrodes.

Any sizes and any types can be handled by our experienced personnel and we can also be called upon to remove such equipment when required.

 

 
     
 
 
     
   
 
Site Designed & Hosted By
Creative Bird Studio