Once hydro tests are satisfactorily completed, all water will be drained from the heat exchanger / vessels and the remaining surface moisture and water droplets can be dried by utilising the same High Velocity Burners.
Our burners can also be strategically positioned and introduced to the Exchanger through suitable available manways or nozzle openings. In order to do so, all other openings into the Heat Exchanger / Vessels will be shut using blanking plates, with the exception of one or two openings, to facilitate in exhaustion of the products of combustion.